Bought a section in Auckland? What to do before you build

By the Tungsten Construction team · Reviewed · 4 min read

Overhead aerial of a new home's slab and timber framing on a corner section in Flat Bush

The short answer

Before you design anything, confirm what the land allows and what it will cost to prepare. Read the title and LIM, check the zone in the Auckland Unitary Plan, get a geotechnical report and topographic survey, confirm water, wastewater and stormwater connections, and talk to a builder about site costs. Then brief a designer with a realistic budget.

Key takeaways

  • Site costs (earthworks, retaining, drainage and service connections) can change a build budget more than the choice of kitchen or cladding.
  • Read the record of title for easements, covenants and consent notices before you design.
  • Your Unitary Plan zone and any overlays decide what you can build and whether you need resource consent.
  • A geotechnical report and topographic survey are usually needed before foundations can be designed.
  • Involve a builder early so the design is priced while it can still change cheaply.

Buying land is the moment many people start picturing the house. The better first step is to understand the land itself. Two sections with the same price and area can carry very different building costs once slope, ground conditions, drainage and services are taken into account.

This guide walks through the checks we recommend before design starts. It is written for Auckland, but most of it applies anywhere in New Zealand.

1. Read the record of title properly

The record of title (often still called the certificate of title) tells you more than who owns the land. Look for:

  • Easements, such as rights of way, drainage or service easements, which can limit where you build.
  • Land covenants, common in newer subdivisions, which may control house size, materials, fencing or even roof colour.
  • Consent notices registered when the land was subdivided, which can require specific foundations, a geotechnical engineer’s sign-off or stormwater measures.

Your lawyer will have looked at these during the purchase. Ask them for copies of every instrument on the title and pass them to your designer and builder.

2. Check the zone and overlays

In Auckland, what you can build is set by the Auckland Unitary Plan. Search your address in the online viewer to find:

  • the zone (for example Single House, Mixed Housing Suburban or Mixed Housing Urban), which controls height, site coverage, setbacks and how many homes are allowed;
  • overlays and controls, such as flood plains, overland flow paths, special character or significant ecological areas;
  • any precinct rules that apply to your area.

If a design breaks a rule, it may still be possible with resource consent, but that adds time and cost. Parts of Auckland’s zoning are being changed through Plan Change 120, which is still going through the hearings process, so make sure you are reading the current rules for your site.

3. Get a LIM and consider a PIM

A Land Information Memorandum (LIM) from Auckland Council summarises what the council knows about the property: past consents, hazards, drainage and rates. You may have one from the purchase.

A Project Information Memorandum (PIM) is specific to a proposed building project. It sets out information the council holds that is relevant to your plans, such as hazards, heritage status and services, and whether development contributions are likely to apply.

4. Commission the site reports

Most new builds need at least:

  • a topographic survey, which records levels, boundaries and existing features so the house can be placed accurately and drainage designed;
  • a geotechnical report, which tells the engineer what foundations the ground needs. Soft soils, fill or slopes can mean deeper piles, rib raft slabs or retaining walls.

Other reports depend on the site: a stormwater or flooding assessment, an arborist report if there are protected trees, or a capacity check on the wastewater network.

5. Confirm services and access

Find out where the nearest public water, wastewater and stormwater connections are, and whether they have capacity. Long or deep connections add cost. On rural or lifestyle blocks, you may need on-site water storage and wastewater treatment instead.

Check power and fibre availability, and how a driveway will reach the building platform. A new vehicle crossing needs council approval.

6. Understand the costs that come with the land

Beyond the build itself, budget for:

  • design, engineering and report fees;
  • building consent and, if needed, resource consent fees;
  • development contributions and infrastructure charges, which can apply when a new home adds demand on council and Watercare networks;
  • site costs, which we explain in detail in our guide to site works before building.

7. Bring a builder in before the plans are finished

The cheapest time to change a design is before it is drawn in detail. A builder who has walked the site can flag issues early: a floor level that will need extra retaining, a footprint that crosses an overland flow path, or a layout that makes framing more expensive than it needs to be.

At Tungsten Construction we start every new home with the land for exactly this reason. Projects like our Kitenga Road home in Flat Bush, on a sloping corner section, show why site set-out matters before the frame goes up.

A simple order of work

  1. Title, covenants and consent notices reviewed.
  2. Zone and overlays checked.
  3. Survey and geotechnical report commissioned.
  4. Services and access confirmed.
  5. Budget set, including site costs and council charges.
  6. Designer briefed, with builder input on cost.
  7. Consents applied for once the design is settled.

If you have just bought a section and want a practical view on what it will take to build, send us the address. We are happy to look at the land before you commit to a design.

Frequently asked questions

Should I talk to a builder or a designer first?

Ideally both, early. A designer shapes the home, while a builder can tell you what the site will cost to prepare and whether a design direction is likely to fit your budget. Getting pricing input before plans are finished avoids redesign later.

What reports will I need before building on a new section?

Most new builds need a topographic survey and a geotechnical report. Depending on the site you may also need a stormwater or flood assessment, an arborist report or an infrastructure capacity check. Your designer and builder can confirm which apply.

How do I find out what zone my land is in?

Search the address on the Auckland Unitary Plan online viewer. It shows the zone, overlays such as flooding or heritage, and precincts that may add rules. Zoning in parts of Auckland is under review through Plan Change 120, so check the current position for your site.

What are site costs on a new build?

Site costs are the work needed to make the land ready for the house: earthworks, retaining, foundations suited to the ground, drainage, connections to water, wastewater, stormwater, power and telecommunications, and the driveway or vehicle crossing. They vary widely between sections.

Sources and further reading

  1. Auckland Unitary Plan online viewer (Auckland Council)
  2. Project information memoranda (PIMs), building.govt.nz
  3. Build a new home, building.govt.nz
  4. Development contributions (Auckland Council)

This guide is general information for New Zealand, current at the review date above. Rules and council requirements change, so check your own situation with the relevant council, your lawyer or other qualified adviser before relying on it.