Building your home · For homeowners and developers
Site works before building: earthworks, retaining, drainage and services
By the Tungsten Construction team · Reviewed · 3 min read

The short answer
Site works are everything needed to prepare the land for the house: earthworks, retaining, foundations suited to the ground, stormwater and wastewater drainage, water, power and telecommunications connections, and access. They depend on the slope, soil, services and access of your section, and can vary more between sites than the house itself. A geotechnical report and topographic survey are the starting point for pricing them.
Key takeaways
- Sloping sites usually need more earthworks, retaining and specialised foundations.
- Soil type, fill and groundwater, identified in the geotechnical report, decide the foundation design.
- Stormwater may need on-site detention or tanks to meet consent requirements.
- Long or deep service connections add significant cost.
- Site access affects every delivery, crane lift and concrete pour.
When people compare build prices, they usually compare houses. But two identical houses on different sections can have very different total costs, and the difference is almost always in the site works. Understanding them early is the best protection against budget surprises.
What counts as site works
- Earthworks. Cutting and filling to create a level building platform, and removing unsuitable material.
- Retaining walls. Holding back cut or filled ground on sloping sites.
- Foundations. Slabs, piles or specialised foundations designed for the ground conditions.
- Stormwater. Pipes, connections and sometimes on-site detention tanks.
- Wastewater. Connection to the public network, or an on-site system on rural land.
- Water supply. Connection and meter, or tanks on rural sites.
- Power and telecommunications. Trenching and ducting from the street.
- Access. Vehicle crossing, driveway and construction access.
Why sites vary so much
Slope
A flat section needs little earthworks. A sloping one may need significant cut and fill, retaining walls and stepped or suspended foundations. Our Kitenga Road project in Flat Bush, on a sloping corner site, is a good example of a build where set-out and site preparation mattered.
Ground conditions
The geotechnical report tells the engineer what the soil can support. Expansive clays, soft ground, uncontrolled fill or a high water table can all require deeper piles or stronger slab designs.
Services
The location, depth and capacity of public services decide how much connection work is needed. A wastewater connection at the back of a long section, or one that needs a pump, costs more than one at the front boundary.
Stormwater requirements
Many Auckland sites must manage stormwater on site. Detention tanks, as seen alongside the framing at Kitenga Road, are a common requirement and need to be planned into the layout.
Access
Narrow, steep or shared access affects how materials are delivered, whether cranes and concrete pumps can reach, and how long each task takes.
How to price site works reliably
- Commission a topographic survey and geotechnical report early.
- Locate services and check their capacity.
- Have the engineer design foundations and retaining for the actual ground.
- Ask your builder to price site works separately and clearly, with provisional sums only where they are unavoidable.
- Keep a contingency for what cannot be seen until digging starts.
Council and infrastructure charges
Site works are separate from council charges, but they are often budgeted together. Development contributions may apply where a new home adds demand on council infrastructure, and infrastructure growth charges apply to new water and wastewater connections. Check these early.
Talk to us about your site
We look at the land before we price the house. Send us your address, and if you have a survey or geotechnical report, include it. We will tell you what the site works are likely to involve.
Frequently asked questions
What is a geotechnical report?
A report from a geotechnical engineer describing the ground conditions on your site, such as soil strength, fill, groundwater and slope stability. It tells the structural engineer what kind of foundation the house needs.
Why do some sites need stormwater tanks?
Councils often require new homes to manage stormwater on site, for example by detaining runoff in tanks and releasing it slowly, to reduce pressure on public networks and the risk of flooding downstream.
Do earthworks need resource consent?
Earthworks over certain volumes or areas, or in sensitive locations, can need resource consent under the Auckland Unitary Plan. Your designer or planner will check the limits for your site.
Are site works included in a building quote?
It varies. Some quotes include standard site works with provisional sums for unknowns; others exclude them. Check exactly what is included, especially retaining, service connections and driveways.
Sources and further reading
- Build a new home, building.govt.nz
- Resource consents (Auckland Council)
- Builders and developers (Watercare)
- Development contributions (Auckland Council)
This guide is general information for New Zealand, current at the review date above. Rules and council requirements change, so check your own situation with the relevant council, your lawyer or other qualified adviser before relying on it.