Granny flats without building consent: how the 70 m² exemption works
By the Tungsten Construction team · Reviewed · 3 min read

The short answer
Since 15 January 2026, a new, single-storey, standalone dwelling of up to 70 m² can be built without a building consent if it meets every exemption condition. It must be built or supervised by licensed building professionals, be at least two metres from other buildings and boundaries, be on land without natural hazards, and you must get a project information memorandum (PIM) from council before work starts. The Building Code still applies.
Key takeaways
- The exemption covers new, single-storey, standalone dwellings of 70 m² or less, including internal garages.
- You still need a PIM before building, and approvals for service connections.
- The work must be done or supervised by licensed building professionals and still comply with the Building Code.
- Sites with natural hazards, or designs that need Building Code waivers, do not qualify.
- Development contributions and other council charges can still apply.
Granny flats, or minor dwellings, are one of the simplest ways to add a home to an existing property: for family, for guests or as a rental. Since 15 January 2026, New Zealand has allowed certain small standalone dwellings to be built without a building consent. The exemption is useful, but its conditions are strict.
What the exemption allows
You can build a granny flat without a building consent if all of these apply:
- it is new, standalone and single storey;
- its floor area is 70 m² or less, including any internal garage;
- it uses lightweight steel or timber framing and lightweight roof cladding (check current guidance, as permitted construction methods have been adjusted since launch);
- it does not include a level-entry shower that needs a waterproof membrane;
- it is built or supervised by licensed building professionals;
- it is at least two metres from other buildings and boundaries;
- it connects to public stormwater and wastewater, or has a compliant on-site system;
- the land is not affected by natural hazards;
- the design does not need waivers or modifications of the Building Code;
- all other exemption conditions are met.
This summary is based on Auckland Council’s published conditions. Always check the current MBIE guidance before relying on it.
What you still need
Even without a building consent, you must:
- apply for and receive a project information memorandum (PIM) before construction;
- get approval for connections to water, power, stormwater and wastewater;
- get any other approvals, such as a vehicle crossing;
- meet the Resource Management Act requirements, including the national environmental standard for detached minor residential units;
- notify council as required during and after construction.
The PIM will confirm whether the site is eligible, note any hazards and include a notice of development contributions if they apply.
What it does not cover
- Converting a garage or other existing building.
- Additions or alterations to the main house.
- Two-storey granny flats.
- Units over 70 m².
- Sites affected by natural hazards.
These still follow the normal consent process.
Exempt or consented: which is better?
The exemption saves consent fees and processing time, but it comes with design limits. Choose the consented route if you want:
- more than 70 m², or a second storey;
- a level-entry shower or other features outside the exemption;
- heavier construction such as masonry;
- a site that has hazards or is close to boundaries.
Whichever route you take, the building must comply with the Building Code, and licensed professionals must do or supervise the work.
Granny flat or subdivision?
A granny flat stays on the same title as the main house. If you want to sell the second home separately, you need a subdivision. See our guides on subdividing a section and how many homes your section can take.
Building a granny flat with Tungsten
We build new homes and small standalone dwellings. If you are thinking about a granny flat, send us your address and what you have in mind, and we will help you work out whether the exempt or consented route suits your site.
Frequently asked questions
Do I need resource consent for a granny flat?
National environmental standards for detached minor residential units now permit many granny flats without resource consent, subject to conditions. Whether your project qualifies depends on the site and design, so check with council or a planner.
Can I convert my garage into a granny flat under the exemption?
No. The exemption only applies to new standalone buildings. Conversions, additions and alterations to existing buildings still follow the normal consent rules.
Does a granny flat still need to meet the Building Code?
Yes. The exemption removes the need for a building consent, not the requirement to comply with the Building Code. The work must be carried out or supervised by licensed building professionals.
Can I build a granny flat larger than 70 m²?
Yes, but it will need a building consent and must meet the planning rules for your zone. Many people choose the consented route anyway for more design flexibility.
Sources and further reading
- Granny flats building consent exemption (Auckland Council)
- Granny flats exemption: guidance and resources, building.govt.nz
- Granny flats building consent exemption becomes law on 15 January 2026, building.govt.nz
- Resource Management (National Environmental Standards for Detached Minor Residential Units) Regulations 2025
This guide is general information for New Zealand, current at the review date above. Rules and council requirements change, so check your own situation with the relevant council, your lawyer or other qualified adviser before relying on it.