Choosing a main contractor for a multi-unit development

By the Tungsten Construction team · Reviewed · 3 min read

Crane truck delivering roof trusses to a multi-unit building site in Manurewa East

The short answer

Look for a builder who has delivered comparable multi-unit projects, prices from your full documentation with clear exclusions, can show a realistic programme with staging, manages sites tidily near neighbours, carries appropriate insurance, and is prepared to give early input on buildability. Check the company on the Companies Register and ask to see current or recent sites.

Key takeaways

  • Comparable experience matters: terraced and attached homes need different sequencing from single houses.
  • Compare prices on the same scope, with exclusions and provisional sums listed.
  • Ask for a programme that shows how buildings will be staged and when units can be released.
  • Site management affects neighbours, council and your project's reputation.
  • Early contractor involvement often saves more than it costs.

For a developer, the main contractor decides whether a project’s numbers hold. A good builder keeps the programme moving, controls variations and hands over units that sell or rent without call-backs. Here is what to look for when choosing one for a terraced or multi-unit project.

1. Comparable experience

Multi-unit residential is its own discipline. Terraced and attached homes involve fire and acoustic separation between units, repeated details that must be right every time, and site logistics where several buildings share limited space.

Ask to see projects of similar type and scale, and if possible visit a current site. Our own work includes terraced and attached homes in Te Atatu South, Manurewa East and Howick.

2. A price you can compare

Give every contractor the same documentation, and ask each to list:

  • what is included and excluded;
  • provisional sums and prime cost allowances;
  • assumptions about ground conditions, services and access;
  • how preliminaries (scaffolding, site facilities, supervision) are priced;
  • the basis for valuing variations.

The lowest number is not always the cheapest project. Watch for missing scope.

Quote comparison checklist

Put the quotes side by side and fill in one row at a time. A blank cell is a question to ask before you compare totals.

Line to check What to look for Quote A Quote B
Earthworks Cut and fill volumes, disposal of spoil, allowance for unsuitable ground
External drainage and services Stormwater, wastewater, water, power and telecommunications connections, and who does work in the road
Retaining and civil works Which walls, driveways and paving are included, and to whose design
Provisional sums and PC allowances Every allowance listed with an amount, and how overspend or underspend is handled
Exclusions Consent fees, development contributions, landscaping, fencing, appliances, window coverings
Preliminaries Scaffolding, site facilities, supervision, traffic management and how long each is priced for
Programme assumptions Start date, weather allowance, staging, and when each building reaches completion
Variations Labour rates, margin on materials and subcontractors, and how time extensions are claimed
Price validity How long the price holds, and which materials are subject to price movement

Send the same drawings, specification and geotechnical report to every contractor, and ask each one to confirm in writing which revision of the drawings they priced.

3. Programme and staging

Ask for a programme that shows how the buildings will be staged, where the critical path runs and when units can be completed. On larger sites, staging can let you settle or rent early units while others are still being finished.

4. Site management

Infill developments sit among occupied homes. Tidy scaffolding and wrapping, controlled deliveries, dust and noise management and good communication with neighbours all reduce complaints and council attention. Clear site signage and fencing are part of this; on our sites, branded fencing also tells neighbours who to contact.

5. Buildability input

A contractor who reviews drawings before they are finalised can often suggest:

  • standardising framing and window sizes across units;
  • simplifying roof forms;
  • sequencing services to reduce rework;
  • material alternatives with better lead times.

This early contractor involvement is usually worth far more than it costs.

6. Company, insurance and licensing

Check the contractor’s legal entity on the Companies Register, including its directors and status. Ask for evidence of contract works and public liability insurance, and confirm that restricted building work will be carried out or supervised by Licensed Building Practitioners. Our company details are listed on our About page.

7. Contract terms

Make sure the contract is clear on:

  • payment claims and schedules under the Construction Contracts Act 2002;
  • retentions, and how they are held;
  • liquidated damages, if any;
  • practical completion and defects periods;
  • how variations and extensions of time are handled.

8. Communication

Agree how progress will be reported, who your single point of contact is and how quickly questions are answered. On a development, slow answers cost money.

Talk to us about your development

We price from consented drawings and are happy to get involved earlier on buildability and staging. Tell us about your site and programme, or read more about how we work with developers.

Frequently asked questions

Should I involve a builder before my drawings are finished?

Usually, yes. A builder can suggest changes to structure, materials or staging that save cost and time, which is far cheaper to adopt before building consent than after.

Fixed price or cost-plus for a development?

Fixed price gives more certainty if the documentation is complete. Cost-plus or a guaranteed maximum price can suit projects where the design is still developing. Make sure the risks of each are clear in the contract.

Can a builder release units in stages?

On many multi-unit projects, yes. Staging depends on the consent, the site layout and services. Plan it with your builder and planner early so the programme and code compliance applications support it.

What should I send a builder to get a development price?

The site address and title, resource consent and conditions if granted, architectural and structural drawings, specifications, the geotechnical report, civil and services drawings, your target programme and staging, and your preferred contract form. Send the same set to every contractor so the prices can be compared.

What should I check about a builder's company?

Confirm the legal entity on the Companies Register, its directors and status, its insurance and the licensing of the people doing restricted building work. Make sure the company you sign with is the one doing the work.

Sources and further reading

  1. Before building work starts (builder obligations), building.govt.nz
  2. Licensed Building Practitioners register
  3. Payment disputes, building.govt.nz
  4. Tungsten Construction Limited on the Companies Register

This guide is general information for New Zealand, current at the review date above. Rules and council requirements change, so check your own situation with the relevant council, your lawyer or other qualified adviser before relying on it.

Related guides

Start a conversation

Tell us about your land or project

Send us the address, what you would like to build and your timeframe. We will come back to you with the next practical step.