# Tungsten Construction > Tungsten Construction (Tungsten Construction Limited, NZ company number 8191118, NZBN 9429049364521) is an Auckland, New Zealand residential building company. It builds new homes for homeowners on their own land and terraced and multi-unit homes for property developers, from land and consents through to handover. - Phone: 021 152 4829 - Email: info@tungstenconstruction.co.nz - Service area: Auckland. Documented projects in Te Atatu South, Howick, Flat Bush, Manurewa East, Karaka. - Company record: https://app.companiesoffice.govt.nz/co/8191118 ## Services - [New home builds on your own land](https://tungstenconstruction.co.nz/new-homes/): full-service custom homes, knock-down rebuilds, granny flats, extensions. - [Construction for developers](https://tungstenconstruction.co.nz/developers/): main contractor for terraced and multi-unit residential developments. - [Build process](https://tungstenconstruction.co.nz/build-process/): six stages from land and feasibility to code compliance and handover. ## Projects - [Toscana Drive, Auckland](https://tungstenconstruction.co.nz/projects/toscana-drive/): Custom home. A multi-level family home with natural stone, black steel glazing, a pool terrace and a full interior fit-out. - [Walters Road, Karaka](https://tungstenconstruction.co.nz/projects/walters-road-karaka/): Custom home. A large gabled family home on a rural-residential section in Karaka, with a stone chimney and a pool under construction. - [Kitenga Road, Flat Bush](https://tungstenconstruction.co.nz/projects/kitenga-road-flat-bush/): Custom home. A large new home on a sloping corner section in Flat Bush, photographed at the framing stage. - [Te Atatu Road, Te Atatu South](https://tungstenconstruction.co.nz/projects/te-atatu-road-te-atatu-south/): Multi-unit development. A row of attached terraced homes in Te Atatu South, built from timber frame to finished rooflines. - [Myers Road, Manurewa East](https://tungstenconstruction.co.nz/projects/myers-road-manurewa-east/): Multi-unit development. Three blocks of terraced homes in Manurewa East, photographed as the roof trusses went on. - [Finnerty Avenue, Howick](https://tungstenconstruction.co.nz/projects/finnerty-avenue-howick/): Multi-unit development. Two-storey attached homes in Howick, photographed in building wrap and as cladding went on. ## Guides (New Zealand building and development, Auckland focus) - [Bought a section in Auckland? What to do before you build](https://tungstenconstruction.co.nz/guides/bought-land-what-next/): Before you design anything, confirm what the land allows and what it will cost to prepare. Read the title and LIM, check the zone in the Auckland Unitary Plan, get a geotechnical report and topographic survey, confirm water, wastewater and stormwater connections, and talk to a builder about site costs. Then brief a designer with a realistic budget. - [How to subdivide a section in Auckland: from feasibility to new titles](https://tungstenconstruction.co.nz/guides/how-to-subdivide-a-section-in-auckland/): An Auckland subdivision runs in five stages: a feasibility check of zoning, services and costs; a subdivision resource consent; the physical works required by the consent conditions; the council's section 223 and section 224(c) certificates; and lodging the survey plan with LINZ so new records of title are issued. Building the homes can run alongside or after these steps. - [What drives the cost to build a house in Auckland](https://tungstenconstruction.co.nz/guides/cost-to-build-a-house-in-auckland/): The cost to build a house in Auckland depends mostly on the site, the size and complexity of the design, the level of specification and the contract type. Floor area alone is a poor guide: a sloping site, a complex roof or a high-end finish list can move the price more than extra square metres. A reliable figure comes from a builder pricing your actual site and a developed design. - [How long does it take to build a house in Auckland?](https://tungstenconstruction.co.nz/guides/how-long-does-it-take-to-build-a-house/): Plan for the whole project, not just construction. Design and engineering, then building consent (and resource consent if needed) usually take several months before work can start on site. Construction of a standard single home then commonly runs for many months, depending on size, complexity, weather and the site. Finally, the code compliance certificate is issued after the final inspection. - [Resource consent vs building consent: what you need to build in Auckland](https://tungstenconstruction.co.nz/guides/resource-consent-vs-building-consent/): A building consent checks that the proposed building work will meet the New Zealand Building Code, and almost every new home needs one. A resource consent checks that the use and development of land meets the Auckland Unitary Plan, and is only needed when your project breaks a planning rule or involves subdivision. Some projects need both, and resource consent usually comes first. - [Build on your own land or buy a house-and-land package?](https://tungstenconstruction.co.nz/guides/build-on-your-own-land-vs-house-and-land-package/): Building on your own land gives you the most control over design, builder and specification, but you take on more decisions and more site risk. A house-and-land package bundles the section and a set design at an agreed price, which is simpler, but offers less choice. The right option depends on how much control you want, your budget certainty and your timeframe. - [Your rights under a New Zealand residential building contract](https://tungstenconstruction.co.nz/guides/residential-building-contracts-nz/): For residential building work costing $30,000 or more including GST, your builder must give you a disclosure statement and the official consumer protection checklist before you sign, and the contract must be in writing. Regardless of cost, the Building Act implies warranties that the work will be done properly and with suitable materials, which can be enforced for up to 10 years. There is also a 12-month defect repair period after completion. - [How construction loans and progress payments work for a new build](https://tungstenconstruction.co.nz/guides/construction-loans-and-progress-payments/): A construction loan releases money in stages as the house is built, rather than as one lump sum. The bank typically needs your building contract, consented plans and a valuation of the finished home, then pays each progress claim after checking the work. New builds are exempt from the Reserve Bank's loan-to-value restrictions, which can make a smaller deposit possible, but each bank still applies its own lending criteria. - [How many homes can I build on my section in Auckland?](https://tungstenconstruction.co.nz/guides/how-many-houses-can-i-build-on-my-section-auckland/): It depends on your zone in the Auckland Unitary Plan, any overlays on the land, the size and shape of the section, access, and whether the wastewater and stormwater networks can take more homes. Zones such as Mixed Housing Urban and Terrace Housing and Apartment Buildings allow more intensive development than Single House. Auckland's zoning is being revised through Plan Change 120, so confirm the current rules for your address before you plan. - [Choosing a main contractor for a multi-unit development](https://tungstenconstruction.co.nz/guides/choosing-a-main-contractor-for-a-development/): Look for a builder who has delivered comparable multi-unit projects, prices from your full documentation with clear exclusions, can show a realistic programme with staging, manages sites tidily near neighbours, carries appropriate insurance, and is prepared to give early input on buildability. Check the company on the Companies Register and ask to see current or recent sites. - [Knock down and rebuild in Auckland: is it worth it?](https://tungstenconstruction.co.nz/guides/knock-down-and-rebuild-auckland/): A knock-down rebuild can make sense when an older house needs extensive work, does not suit the site, or when the land could take a better or larger home. You will need to check zoning and overlays (especially special character areas), test for asbestos, arrange disconnection of services, and get consents for demolition and the new build. Compare the full cost and time against a major renovation before deciding. - [Granny flats without building consent: how the 70 m² exemption works](https://tungstenconstruction.co.nz/guides/granny-flat-rules-nz/): Since 15 January 2026, a new, single-storey, standalone dwelling of up to 70 m² can be built without a building consent if it meets every exemption condition. It must be built or supervised by licensed building professionals, be at least two metres from other buildings and boundaries, be on land without natural hazards, and you must get a project information memorandum (PIM) from council before work starts. The Building Code still applies. - [Site works before building: earthworks, retaining, drainage and services](https://tungstenconstruction.co.nz/guides/site-works-before-building/): Site works are everything needed to prepare the land for the house: earthworks, retaining, foundations suited to the ground, stormwater and wastewater drainage, water, power and telecommunications connections, and access. They depend on the slope, soil, services and access of your section, and can vary more between sites than the house itself. A geotechnical report and topographic survey are the starting point for pricing them. ## Company - [About and company information](https://tungstenconstruction.co.nz/about/) - [Contact](https://tungstenconstruction.co.nz/contact/)